on 02-08-2018 10:21 AM
Hi all,
we've activated the BB for our S
andbox on S4HANA on Premise.
Currently I'm fighting with some automazations in Inbound.
1. Automatic Packing in IBD currently not working
Customizing is done, automatic packing (button) works in work Center, but not during IBD process. Here are the customizing settings:
2. Automatic WT creation on GR posting
After I've packed the materials manually (means in work center with automatic packing button) no WT are created automatically. I also don't see any PPF action on item level. Automatic creation with manual trigger the Button works, so it's not an issue with the PACI.
Thanks for help.
br
Roman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Roman,
Auto Packing-> https://answers.sap.com/questions/221006/auto-packaging-specification-is-not-determined-in.html
2. Automatic WT creation on GR posting-> Hope Condition record is maintained according to Del. Proc Delivery.
Kind Regards,
Ajit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Roman,
1. Auto Packing: Did you check the OSS 2416456 in the link https://answers.sap.com/questions/221006/auto-packaging-specification-is-not-determined-in.html ?
2. Automatic WT creation on GR posting:
-> Action definition for WT is activate in Action Profile ?
-> Determination Procedure Access Seq. for PPF Config ?
-> /SCWM/DLVPPFC - Maintain Condition Records for PPF Schedule Conditions if 0DMWT is assigned to condition maintenance group
-> Please check the PPF Log in Tcode PRDI in PPF tabor SPPFP
Please let us know if you have further queries.
Kind Regards,
Ajit
Hi Roman,
Schedule Condition has 5 types of return.
0: valid condition record found
1: no determination procedure found in customizing
2: no valid condition record found
3: error in determination of condition records
4: no search fields found
In your case, it is 1 that means no determination procedure found in customizing.
As I already highlighted about the access sequence "-> Determination Procedure Access Seq. for PPF Config ?" Please check the screen shot and let us know if you have further queries.
Kind Regards,
Ajit
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.