Skip to Content
author's profile photo Former Member
Former Member

manual intervention from jdbc-rfc scenario

Hi...Experts,

my scenario is jdbc-rfc synchronous scenario,we are sending the data from Oracle Database to ECC, client is insisted for manual intervention before posting the data in to SAP, when ever client wants to process the data from XI system (like press the F8 button manually by user), then only the data will enter into SAP.

let me know me how to achieve this type of requirement.pls help us at the earliest...

Points will be rewarded for the helpful answers.

thanks in advance,

Pasi

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 18, 2008 at 10:26 AM

    Hi,

    Why don't you create jobs in Xi and run them when ever you wanted them to.

    check these for adapter scheduling..

    http://help.sap.com/saphelp_nw04/helpdata/en/45/06bd029da31122e10000000a11466f/frameset.htm

    this blog too..

    /people/shabarish.vijayakumar/blog/2006/11/26/adapter-scheduling--hail-sp-19-

    Thanks,

    Vijaya.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.