Skip to Content
author's profile photo Former Member
Former Member

how to use parallel dynamic block in guided procedures!!

hi

My application is as following i have to initiate a process from a webdynpro for java application and after that i have to send the action to the multiple users..

For that i created a parallel block inside that a sequential block and inside that an action .

In my wdj coding i created a variable user and assigned this parameter for the role of that action.

But the problem is it is not going to the multiple users.

pls suggest me if there is some other solutions to do this.....

Pls give me a solution it is urgently needed

With regards

Shanto Aloor

Edited by: Armin Reichert on Jun 18, 2008 12:11 PM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 18, 2008 at 12:06 PM
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.