Skip to Content
author's profile photo Former Member
Former Member

Repetitive Manufacturing

Hi guys,

Please do help me out in "Repetitive Manufacturing" in PP module..how to do process with the help of Transaction codes.

pls let me know the step by step process..and give me

some information like what are all the steps taken in that

process..

Thanku

Jino

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 18, 2008 at 09:54 AM

    hi

    for rem, Master data is BOM, rate routing (CA21) work center, and production version. make product ccost collector for you material and production version.in KKF6N before that standard cost estimate in ck11n and then update in maerial master by CK24.

    In REM it is run scheduling quantity. so remained planned order. with order type PE.

    MFBF (backflushing) is nothing but confirmation with goods issues for bom material and goods reciept of finished material.

    Regards

    Pravin

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 18, 2008 at 10:25 AM

    Hi,

    Refer below link for further details..

    http://www.sap-img.com/production/steps-to-do-repetative-manufacturing.htm

    Regards,

    Siva

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.