Planned Delivery Cost

hi experts

I have raised a PO and have made 3 GRN's against the PO along with Delivery cost. now i have received 3 bills against the 3 GRN from the vendor.

When i do MIRO for the 1st GRN the delivery cost is picked as a whole amt for all GRN's put toghether and not for that particular GRN. My MM consultant says you need to change the delivery cost manually for the particular GRN, which my client is not accepting.

Please guide

Regards

Ganesh

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 18, 2008 at 11:04 AM

    Hi

    For each GRN you raised seperate IR. In that case you have to split the amount.

    Even if you are posting only one IR for all , system creates a seperate line item in case of the delivery cost

    VVR

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.