Skip to Content
avatar image
Former Member

PS STATUS CLOSE PROJECT

Dear PS gurus,

We have been with the PS module for two years, the first year for the closure we made the technical closure of the WBS elements, but we did not know and this placed the deletion indicator in the order request, the purchase people hit us the I shout that this should not be the case for audit issues and we have to reverse it. For this reason we have not been able to close the projects and year after year we are taking all the projects and we have not been able to solve this problem. It is possible that we can close these projects so that the users do not think of reusing them and in the carry over we carry out the projects that really correspond. The doubt that we have is that in order to be able to make this closure necessarily, it is mandatory to carry out the technical closure and subsequently close or there is another way to do it.
It is possible to parameterize that at the time of technical closure do not delete the requests


Thank Regards
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers