Skip to Content

extrapolation during creation of PS

Hi Experts,

can we create payment scheme without simulated bill document? After calling the event R510 a standard fm is called for extrapolation. If the system has failed to create simulated bill document through this FM (which is happening in my case) I can find that the system is still allowing to create payment scheme. Is this correct scenario?

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.