Is it possible to stage a material via EWM PMR with ECC backflushing

Hi, is it possible to stage a material via EWM PMR and backflush in ECC during confirmation? I am trying but getting COGI error "Essential transfer parameters are missing in record: 000001".I am using EWM 9.4 and ECC 6.00 ehp7.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Feb 07 at 05:40 PM

    Hi,

    Well, according to this you can: https://help.sap.com/viewer/3d97bec9bf1649099384bb8167df3cf2/9.5.0.1/en-US/ae9beb535cbb5d1ee10000000a441470.html. But never tested it.

    The thing I just always wonder: why the hell would you want to do this??? The whole purpose of the PMA is to have no deliveries for the production order. Why do people always want to do one thing - and then mess it up with something else?

    Brgds

    Juergen

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 13 at 01:36 PM

    Thank you for your reply Juergen,

    Apologies but I have only just found it. I agree with your comment and it is poor practice to backflush batch managed materials however, it is not possible to measure the quantities between different process orders, and there should be only 1 (maximum 2) batches of the material on the PSA at any one time, so back-flushing is the only route for consumption. I have overcome my initial problem, the Shipping Point was missing, now during confirmation, if a component material is not batch managed an outbound delivery is being created no problem, but for batch managed materials I am getting COGI error "T331 entry for warehouse number XXX and storage type not found" and no delivery is created, any ideas how to fix this?
    I have found OSS note, but not sure if it is correct one to solve my problem 1969012 - EWM-relevant storage location: Incorrect or no batch determination?


    Appreciate some advice please, regards, Emma.