cancel
Showing results for 
Search instead for 
Did you mean: 

time evaluation error

Former Member
0 Kudos

img-20180206-wa0018.jpgi have got a error while running time evaluation,even after entering data in table t549q the same error is occuring.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

The problem is that you haven't extended the Period Parameter you are using in your time balance, either that or the period parameter no longer exists. Look at rule 410 in V_T559P and cross reference that with the period parameter in V_T549Q.

Hope this helps.

Richard

0 Kudos

Please Check Payroll Periods for 01 2014 Month. If u maintained Share screenshot of that once.

Thanks.

Sudhkar.N