Dear Experts,

I have a requirement that the alert must be shown for the Receipt elements that come too early. So in the Location Product master, I specify the time variances allowed between the requirements date/time and availability date/time before the system should create date/time alert which is 1 hour. (See ctempproduct-master.jpg)

Then I create the Purchase Req with available date/time is 13.02.2018 19:00 and there is a DepDmd on 13.02.2018 19:30 (See ctempproduct-view.jpg) . I am expecting the alert will not come out as it's still within tolerance 1 hour. But the actual result is differ from what I expect, the alert is there.

The alert is shown because the Variance is 7.51 hours (See ctempdate-alerts.jpg) . It come from the comparison between availability Date/Time of the Purchase Req versus the Requirement End Date/Time of the DepDmd.

The question is :

1. Why it use Requirement End Date/Time ?

2. Is there any setting to use the Requirement Start Date/Time instead ?

Thank you,

Kartini

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.