Movement type for GI of material reserved from Network not allowed

599 Views

Hi Experts,

Hope all are doing well.

I am facing a problem in PS, I have the following scenario.

I have some material in a storage location say 1010 - project storage location.

I want to use that material for some project. I have created a reservation from the Network for an activity 0010 with Procurement indicator - Reservation Plan Stock and Item category L.

After this saved the network, system generated reservation number.

I want to issue the material against this reservation from the Project Storage Location. (its not marked as Project Stock)

When I am trying from MIGO system says the material is not maintained for Q i.e., Project Stock.

I checked the movement type it is 281 Q, GI Network from Project, where as I want the Movement type 221 GI for Project from own.

The Movement type field in the Where tab of MIGO screen is in grat mode. So I cannot change that field.

Please tell me how can I issue the material from a storage location to the project for the reservation created from the network.

I am able to issue the material in case I am creating a manual reservation through MB21 with movement type 221.

Please guide me on this.

Thanks and Regards