Skip to Content
author's profile photo Former Member
Former Member

User done GR with wrong posting date

Hi

User done GR with wrong posting date. This material is quality managed. Quality people UD taken and accpeted. Next MM users aksing to cancel the material document. System not allowing. Manually lot created. Then system throwing error while cancelling document as follows;: Cancellation not possible , since part of the inspection lot posted . Pl advise me .

regards

ssp

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 17, 2008 at 05:31 AM

    Hi,

    There is no need to create a manual lot.

    But if there is a lot still existing for the material, please clear the lot and post the material in unrestricted stock. After posting through quality, try to do GR reversal by movement type 102. Do not cancel the document as it will try to fetch the stock from quality stock anf the feild becomes uneditable.

    Regards

    Amit Parkhi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 03:03 PM

    hi,

    please check the quality flag has to removed while cancel the document.

    Regards

    Mohan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.