Cost Break Up of Internal Orders-Overhead

Hi mates,

I have created an internal order with an object class: u2018Over Headsu2019, for which costs were pooled and finally internal orderu2019s balances, are to be settled against the FG material.

I want to see the cost components breakup for the costs incurred in the internal order.

Can anybody help as how and where to link the cost component structure to the internal order, so that I could see the cost break up and also request to give the areas of integration between Project System and Controlling

Thanks in advance

KS

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 02:01 PM

    Hi,

    Report S_ALR_87012996 will be of help to you. For settlements, you look in the config for Allocation structure & settlement profile that your order/order type is assigned to.

    Thanks

    Jagdish

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.