on 06-16-2008 1:56 PM
Dear Experts ,
Is it possible to change BOM usage from production 1 to design 2 ? Any mass change T code ?
Neal
Hi,
The only suggestible way is to create a new BOM by copying ther old one. If the existing BOM are more in number then you can create a BDC or LSMW for copying. Take the help of ABAPer for the same.
Regards
Amit Parkhi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
i suggest you to make it universal for that you can used it for production and design also.
regards
Pravin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
If I make BOM universal , I need to ,make alternative BOM as Engineering BOM will have several levels and production BOM has all the components and assy on single level .
MRP might pick up wrong BOM .
Is there any T.code by which we can make mass copy or change BOMs . AS in system there are many BOMs which needs to be copied as is with new usage .
Neal
I dont think we can change the BOM usage - the only alternative I see is to create new BOMs with changed usage and then deleet the old
Please advice
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.