Material movements after validity date of last standard cost estimate

Hi Gurus,

I'm new in Material Ledger and I have a couple of questions.

1.

We have Material Ledger active with price det. 3 and with dynamic price release.

The last standard cost estimate to a certain material was with the dates from 01.01.2016 to 31.12.2016.

But turns out that I can see movements beyond the validity date like there was nothing happened. Can the system carry over somehow the cost estimate or standard price beyond this date (31.12.2016)?

2.

I can see cost estimate in KEKO with the start date 01.10.2016 and validity date 31.12.9999 (no cost run to this cost estimate). But wherever I look, CK13N or KKPCN the system can't see this cost estimate only the last one with the dates from 01.01.2016 to 31.12.2016.

Can anybody give me a hand where to look or what is the probable answer here?

Thanks in advance

Joe