How to assign requirements types to pant???

Best Regards,

Dwi

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 03:47 AM

    Hi

    Define requirement type.Define strategy and assign requirement type.

    Define strategy group and assign strategy.Assign strategy group to MRP Group and Plant.

    Regards,

    Rajaram.K

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 04:09 AM

    Hi,

    To assign the Requirement type, Requirement class is necessary.

    Requirement class(say 100) linked with Requirement type (LSF).

    This requirement type is linked with Strategy(10).

    Check in SPRO> Define strategy.

    You can assign more than one strategy in Strategy group.

    Strategy group assigned in MRP 3 view of Material master.

    This material is assigned to Plant.

    This is how assigning the Requirement type to Plant.

    Regards,

    Dharma

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.