net work

hi master

at what situation we used net work. pl explain

regards

prasanthi

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 14, 2008 at 03:28 PM

    Hi,

    we normally use networks for costing,scheduling scenarios

    regards

    pv

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 05:54 AM

    hi,

    u can use network if you need detail cost planning with particular dates and want to use materials in ur cost planning nd check the same under costs in [help.sap.com]

    regrds

    pushpa

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 06:53 AM

    HI Prasanthi,

    If the client is asking for Material procurement (MRP) for a project (Cusomer or Investment) then you have to maintain the N/W related config.,customizing activities and steps with respect to that Material group or Material.

    Hope this helps you better.

    Thanks,

    Sanju....

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 17, 2008 at 04:51 AM

    Basically network in the project structure has four meanings;

    1) Networks are used to separate the activities beneath in different categories

    2) Network is the level where from several users can simultaneously work on the same project, but on different networks (this requires the u201CDisplay<>Changeu201D function from the u201Ceyeglasses and penu201D-button

    3) Needed in releasing/not releasing purchase requisitions

    4) Needed in scheduling.

    To create a network attached to this project, drag the network icon under Templates > Individual objects to the Project number in the upper left. This will start a screen to the right with a header and defaulted to the Control-tab. There are 4 other tabs presented of which only Scheduling and Assignments will be discussed.

    I think it may helpfull u a lot.

    with regards

    Raman

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.