Costing- Production order

Hi All

What is TOTAL ACTUAL COSTS?

What is TOTAL PLAN COSTS?

What is TOTAL TARGET COSTS?

I am seeing all the above costs in Production Order COST ANALYSIS.

Anyone can explanin me what it is ? from where its coming in to cost analysis?

Thanks in Advance

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 16, 2008 at 06:27 AM

    Hi,

    The actual cost is the Cost of the material after the Production

    Plan cost is the cost of material before the production...

    target cost is the targeted cost the material production..that means for this particular material the cost will be targeted eg:10 rs the after the production the cost of material should not exceed this cost....

    if usefu; assign points...

    regards,

    santoshkumar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.