Error in Sub contracting

Former Member
0 Kudos

Hi Forum,

I am creating a Sub contracting order and the system is giving me the error message that Not possible to determine any components. where as I have maintained components for the material.

Please help me with this error.

Thanks and regards,

Ashish

Accepted Solutions (1)

Accepted Solutions (1)

deiva
Active Contributor
0 Kudos

You have to maintain BOM for finished material or enter manually the components sub products in material data tab in Po item level.

Generally, you have to issue the semi finished product to your vendor to get the finished product.

Former Member
0 Kudos

Thanks for your response..

I did as directed by you and Issued the goods to the vendor in MB1B.

While receiving the goods i m getting the error

NO Special stock O 0000100001 CM10010 of this material does not exist

Please help me to solve this error.

Thanks and regards,

Ashish

csaba_szommer
Active Contributor
0 Kudos

Hi,

Your problem was with subcon-order creation. How did you achieve to have components in your PO?

1. Your PO is issued for F-30 material.

2. The component list of your PO contains the components.

3. The components have been posted to your SC Vendor's special stock via MB1B + 541 (with or w/o PO reference). Can you see them in MBLB at your vendor that is in your PO header?

4. Now you are booking GR against your PO (mvt 101 for F-30 material). If your components are at your SC Vendor's special stock there should be no such problem I think.

BR

Csaba

Edited by: Csaba Szommer on Jun 13, 2008 5:18 PM

Edited by: Csaba Szommer on Jun 13, 2008 5:19 PM

Former Member
0 Kudos

Hi,

Pls check that you have maintained sub-components and stock exists for that material at that vendor.

I think while doing goods issue also you can check sub-components.

Pls reply if not resolved.

former_member192897
Active Contributor
0 Kudos

Hi,

First check whether BOM is maintained properly or not. If maintained Check the Validity period for components.

Please ensure before issue stock to Sub contracting vendor using MMBE or ME2O whether stock is available with that vendor or not.

Please let me know the status if your peoblem is not solved.

Reg,

Ashok

Former Member
0 Kudos

Thanks to all

Answers (4)

Answers (4)

kunal_ingale
Active Contributor
0 Kudos

hi

u have to create BOM (CS01) for the finished good or just enter components in material tab at item level , u will find component tab there and one more thing the that check the delivery date or the date of validity of bom

the bom date should be in past or the delivery date have to be in future

plz check this

ur problem will be solve

reward if useful

regards

kunal

Former Member
0 Kudos

HI,

please check your PO whether its created correctly or not.

Like : 1) item category L is selected

2) BOM is made

Goods are issued with correct Mvt type 541

Please check the vendor stock in MMBE

csaba_szommer
Active Contributor
0 Kudos

Hi,

There are many threads on this forum in this issue. Please have a look at this:

Best wishes,

Csaba

Edited by: Csaba Szommer on Jun 13, 2008 3:51 PM

Former Member
0 Kudos

Hi Ashish

Just check The BOM

OR Change delivery date in PO say after one month

Regards

Anil