Hi,

I have creted outline agreement for a material A with value 10 per kg. Material Mater price is 12 per Kg.

I have created activity in CJ20N for a network assigned to WBS, & assigned material A to a activity, I have maintain outline agreement in Purch Data tab page of detail screen but the rate is proposed by system as 12 (from material master). Requirement: if rate is maintained in outline agreement same should be pick up in Purch Data tab page of detail screen.

Regards

Bipin

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jun 14, 2008 at 08:10 PM

    Can you please check the costing variant and in that strategy for material pricing? I guess you need to change the strategy there.

    I dont have system access today, else i could have helped with you the TCODE.

    Do let me know if you could not resolve it.

    Ritesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.