on 06-13-2008 6:29 AM
Hi Gurus
When i do product costing run in tcode Ck40n i select materials and run it.but some materials are not costed. can any one help me out.
thanks in advance.
hi,
Step 1:
Header Data u2013 Create a costing run by specifying a name. Also enter description of the same along with date for which the costing run is taken
Finally save this data.
Step 2:
General Data u2013 Select Costing Variant, Costing Version from the available options. Enter Controlling Area and Company Code.
Step 3:
Processing - Selection of Material
Click on the parameter icon, which will open a new window u2013 change parameter window. In this window enter single material code/ range of material/ multiple material code and plant code.
Tick the field u201CAlways Recost Materialu201D and remove tick from background processing. After this save the data and go to the previous screen.
Click the execute button. The status field will show a green signal if all the materials were selected correctly, else will show red signal specifying error.
Processing u2013 Structured Explosion
This step will read the Bill of Material for the selected product/products. Go to change parameter window and remove tick from background processing. Save the data and go to the previous screen.
Execute this step and the status field will show green signal for successful execution.
Processing u2013 Costing
This step will create standard cost estimate for all the materials selected in Selection step and BOM exploded in structured explosion step.
Go to change parameter window and remove tick from background processing. Save the data and go to the previous screen.
Execute this step and the status field will show green signal for successful execution. The materials field will show total no. of materials that were costed.
Processing u2013 Analysis
After costing step is over, a report is generated that enables to process and analyze the costing results. For example, compare the costing run with other costing runs or compare the costing results with a price from the material master.
After this remove tick from background processing field in the change parameter window and return to the previous screen for executing this step.
Processing u2013 Marking
This step will mark the standard cost estimate for the costed products in the previous step. If the authorization field is locked, then it is to be opened by selecting the relevant company code.
This step would enable the results of standard cost estimate to be updated as future price in the material master.
Go to change parameter screen to make relevant changes and then execute this step after returning to the main screen.
Processing u2013 Release
This is the last step in costing run transaction. This step will update the results of standard cost estimates in the material master as the current standard price.
It is to be noted that after releasing a cost estimate for a material in a company code, no marking or release can be carried out again for the current period. Before releasing a cost estimate, is should be made sure that the future standard prices are correct.
Go to change parameter screen to make relevant changes and then execute this step after returning to the main screen. To verify the updated prices, check the material prices in material master.
At every step if there is any error or warning, the log field will display it in detail.
Just go through the steps any steps ur missing...nenu santosh nee babai....
regards,
santosh kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Govind
Check your errors and be specipic of your problem/error, to enable to suggest the solution.
Check and revert back,if not resolved
regards,
maalik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In costing run you can check the log. Defnitely the log will guide you. Apart from the log also check price control indicator in material master.
Regards,
Venkata Satish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Lot of reasons might be for this. Check whether you have maintained BOM, Routings, Activity Prices, Planned prices for material, cost component structure also.
sateesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.