Quota Arrangement

Hello!

I am using a quota arrangement with 2 vendors. I have entered a min lot size for both vendors and with a quota of 35 and 65%. Everything with the QA is working fine except, when I run MD42 to do single item planning, I am getting fractional lots. For example, say my min lot is 3 for vendor A and 10 for vendor B. Instead of it planning for 15 pcs, it is planning for 16 pcs for vendor A and instead of 100 pieces, it will plan for 102. How can I get the proposed quantity to be multiples of the lot size? We are manually having to adjust these each time. I am currently using Lot Size of EX in MRP 1 of the material master.

Will reward full points or points for any helpful answer!

Thanks in advance!

Nic

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jun 17, 2008 at 03:20 PM

    hi,

    You have tick the splittign quota in OMI4 for EX as per the calculation it will be in fraction.

    Please configure rounding profile.

    G.Ganesh Kumar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.