Difference between Eng BOM and Prod BOM

Dear Gurus ,

I want to know difference between Eng BOM and Prod BOM . We have standard multilevel engineering BOM but if I use that BOM for routing assignment I can only see 1 st level components . Can I put all components in single level so that I can assign them in FG routing and pick list will have all the components ?

We are thinking of considering all assy as phantom so that there would be only one prod order for FG .

Neal

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 12, 2008 at 11:23 AM

    Hi,

    Yes for only one production order for the FG, u will have to maintain only single level BOM. you can then have all the components in routing for allocation also.

    Engineering BOM is basically not relevant for production and costing, unlike production BOM.

    Regards

    Trin

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 12, 2008 at 12:24 PM

    Hi friends

    my client generating serial numbers manully. now the stock is in unrestricted. now he want to replace the serial numbers with other numbers. is it possible. pl guide me.

    serial no status is : ESTO

    regards

    ssp

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 12, 2008 at 12:56 PM

    Hi

    Engg BOM is use ful if the clinet implement ECM, DMS modules. Engg BOM is nothing but design BOM. Usage production means process BOM, usage Engg means design BOM. It will helpful for document managment systems moudle.

    regards

    ssp

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 13, 2008 at 04:22 AM

    R

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 14, 2008 at 07:38 PM

    You can assign multilevel BOM components to a

    single Routing (through Routing Groups), but

    you cannot assign component allocation to more than

    a single material (radio button) - this component

    allocation inturn reflects when planned orders are

    converted into production orders

    Regarding difference between Engg and Production BOM,

    Engg BOM is used for design purpose (Item Category D - Document)

    and not used in the production of the finished product.

    and Production BOM is used in the production of the finished

    product (Item Category L)

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.