Skip to Content
author's profile photo Former Member
Former Member

Log of Incompleteness

For my delievry by item category , if I want to define a log of incompleteness , how to I go about doing it , I mean how do we configure a material for log of incompleteness.

Just want to know what are the steps to go arround doing it.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 12, 2008 at 02:21 AM

    Hi,

    for this we need to define Status group for Item cat. and assgin the incomplete procedures in SPRO. Below link is useful.

    http://sdconfiguration.blogspot.com/2007/12/partner-determination-and-control.html

    Reward Points if useful

    Raj.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 07, 2008 at 08:10 PM

    .

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.