How to CIF enterprise Change Management ECM, from ECC to APO

Dear All.

I am facing problems during CIF process for ECM (Enterprise Change Management) from ECC to APO.

Every change into Material Master, BOM, etc, we must to create one Change Number (CC01) and link with the master data that we are changing.

But when we are changing the BOM status to 02 - Inactive for a specific period, and then transport this information from ECC to APO using Core Interface, into APO the BOM, in this case PPDS, will be changed for the Whole Period. It means that the PPDS will be set as Inactive into APO being set to become inactive in the future on ECC.

Thank you all.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jun 18, 2008 at 06:37 PM

    Somebody knows where I can found information regarding Core Interface for ECM (Enterprise Change Management).

    Thank you all.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.