on 06-10-2008 2:53 PM
Hi
During the installation of systems, I planned for Solution manager 4.0 as a central SLD. And I installed ECC system and PI system linking to this SLD.
As of now, I have completed just the installation of the three systems with Solution manager as SLD. I didnt do any configuration.
I need to know, if there is any way to change PI system as a SLD? There is no need for solution manager system in our landscape. So, what changes should I make to define this PI system as my SLD system?
Hi,
hope this blog could be helpful:
/people/boris.zarske/blog/2007/06/10/an-overview-of-the-documentation-required-to-set-up-the-system-landscape-directory-sld-of-sap-netweaver
Regards
Patrick
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.