Depending On Quota Arrangement PR to PO

Dear All,

PR is cretaed manually or automatically generated through MRP.

This this assigning of Source is done by ME57 and i want to pick on quantity percentage basis.

Like Ex - PR generated for 1000 Material and for this material source should to picked depending on percentage basis.

quota arragement and source list maintained for 1000 quatity as

400 - Vendor X

150 - Vendor Y

550 - Vendor Z

How the system will be picked the vendors for the the PO generation with the sources on % basis which is maintained in Quota arrangement.

Explain me the flow

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jun 10, 2008 at 04:51 AM
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.