My client wants to do resorting and after each resorting of product, client wants to capture cost involved for resorting of that particular material.

For this I will raise a quality notification and thru notification I will create a QM order also. Could anyone tell me by which T Code quality will be confirming this newly created QM order. Means where I will enter cost of this particular QM order?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jun 09, 2008 at 06:46 AM
    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Thyagarajan Krishnamurthy

      I will be doing resorting activity for products which are manufactured seperately out of 2 machines. I want to capture cost involved in resorting activity of all products from these 2 machines seperately. I am capturing this information through quality notification. I will create QM order for capturing cost also. But for capturing cost for machine seperately, should I create work center and I assign it seperately to notification. Or should I assign corresponding cost center (M/c wise cost center) during KB21n trasaction code.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.