How to confirm quality order

Former Member
0 Kudos

My client wants to do resorting and after each resorting of product, client wants to capture cost involved for resorting of that particular material.

For this I will raise a quality notification and thru notification I will create a QM order also. Could anyone tell me by which T Code quality will be confirming this newly created QM order. Means where I will enter cost of this particular QM order?

Accepted Solutions (1)

Accepted Solutions (1)

former_member187991
Active Contributor
0 Kudos

hi

please refer the following links

[quality related cost|http://help.sap.com/saphelp_47x200/helpdata/en/5c/a8b43446a1c564e10000009b38f83b/frameset.htm]

[Non conformity cost|http://help.sap.com/saphelp_46c/helpdata/en/e4/e312d81ff611d4b2cd0050da4ceab0/content.htm]

regards

thyagarajan

Former Member
0 Kudos

TK,

Thank you very much for your fast response. I already awarded full point for your reply.

An Irrelevant question- Are you a QM consultant?

Vineeth

former_member187991
Active Contributor
0 Kudos

No basically iam an PM consultant also looking after QM for support project

regards

thyagarajan

Former Member
0 Kudos

I will be doing resorting activity for products which are manufactured seperately out of 2 machines. I want to capture cost involved in resorting activity of all products from these 2 machines seperately. I am capturing this information through quality notification. I will create QM order for capturing cost also. But for capturing cost for machine seperately, should I create work center and I assign it seperately to notification. Or should I assign corresponding cost center (M/c wise cost center) during KB21n trasaction code.

Answers (0)