Hi all,
When we were trying to release to accounting using VFX3, the following error is coming:
Valuation with material cost estimate: error with material 6500.
Hint: this material is valuated with a price indicator set to "V", but the Product cost estimate view in MM01 has been created accidentally for this material.
message No:Ke350
In profitability analysis (CO- PA), the system tried to valuate a line item using the current standard cost estimate.
In order to determine the current plan period, the system needs to read the valuation segment of the material master.
The system has found that the current plan period is the initial value for material 6500 in plant xxxx
the system looked for the material cost estimate using Costing keyYB2, as defined in the customizing settings for CO - PA
Thanks,