Cannot release production order for a plant

Former Member
0 Kudos

Hi:

When I try to release a process order , I get this error message:

"CAnnot release production order for plant".

I get this message for a particular material in the plant. For other materials, it's working fine.

Please give your suggestions!

Gautham

Accepted Solutions (0)

Answers (14)

Answers (14)

Former Member
0 Kudos

Hi All:

The issue is solved.

Wrong strategy was being used in the material master for batch determination. Changed the strategy and everything is working fine.

Thanks a lot for your help.

-Gautham

dhaval_choksi3
Active Contributor
0 Kudos

Hy, Gautam,

Congratulations, nice to read that your problem is resolved.

Hence your problem is resolved after involments of more than 10 SDN memebers active involments. That leads to full TWO pages of morethan 20 threads conversation in response to your question. Now don't you think you should reward points to their efforts. That motivates the memebers to help more and more.

Hence you seems to new to SDN, pls refer the link pasted below describing the procedure and system of rewarding POINTs.

I like to share this not only to you but some of our other friends also who usually forgets to reward the points.

[https://www.sdn.sap.com/irj/sdn/crphelp]

Regards,

Dhaval

Former Member
0 Kudos

Hi All:

There is no material components shortfall.

Also, the logs do not show any error.

-Gautham

Former Member
0 Kudos

Hi,

Since the Error message comes for that particular material, Check with "Plant specific material status" field at MRP view, workscheduling view and also in basic data view.

Is material has batch management activated. Please also let us know the error message Number

Pradeep

Former Member
0 Kudos

Hi All:

I did check the "mrp and basic data views". Also, the batch mgmt is maintained for this material.

But still, it's the same error.

Error Message no. ZMSG008

Gautham

Former Member
0 Kudos

Hi,

Check the Tasklist usage for your routing for that material.

For this usage ,check in op45 against the task list type whether until release indicator has been enabled.If so remove

and do the release.

or

check whether workcenter which is used for producing the material has been locked in work center itself.

Indicator: Usage only until release in orderIndicator used to specify for a task list usage and a task list type that an operation in the order cannot be released. This occurs when a work center group that is not intended for production is allocated to this operation.

When this type of operation in the order is released you must enter the work center where production should take place.

Regards,

nandha

dhaval_choksi3
Active Contributor
0 Kudos

Hy Gautham,

What are the prerequisites you have set before the release?

for e.g.

1)Batch Determination / Derivation

2)Resorce selection codition

3)Missing Part

4)capacity check

5)Control recipe generate

As per your msg no. it looks like developed for some specific function exit , so just sit with your abaper and ask reason code for error msg.

Regards,

Dhaval

Former Member
0 Kudos

Hi All:

I did try everything as suggested above.

But I still get the same error and it's only for this material in the plant. For all other materials it's working fine.

Thanks

Gautham

dhaval_choksi3
Active Contributor
0 Kudos

Hy Gautham,

Very Good Morning.

Have you check material avaibilty?

Regards,

Dhaval

Former Member
0 Kudos

dear Gautham,

can u pls check your Log while releasing the process order and let me know what exactly the error message is ?

regards

Amit

Former Member
0 Kudos

Hi,

Please also Check with "untill rel" check box at OP45.

"Task list usage type" defined at Resource and for the same "untill rel" box at OP45.

Pradeep

Former Member
0 Kudos

Hi,

pls check whether you have maintained the checking group (Avail. Check filed in MRP3 view) for the components and try releasing again.

Former Member
0 Kudos

Is it the production plant ?

Former Member
0 Kudos

Hi Gautham,

Please chech configuration related to avaibilty chech control for the order type and plant you are using. Please let me know whether you are using scheduling profile in the material master.

Regards,

Uday

dhaval_choksi3
Active Contributor
0 Kudos

Hy Gautham.

Check for Material avaibilty, because error due to missing part may not be seen in error log screen. so pls check it manually and comeback.

Regards,

Dhaval

Former Member
0 Kudos

hi

Check the setings of avalability check in OPJK for ur order type and plant.

Amit

Former Member
0 Kudos

Hi Gautham,

Pl check OPJK setting maintained for your plant and order type. If not maintain it, Production order will get released.

Srini

Former Member
0 Kudos

Hi:

The work scheduling tab was activated for the material.

Also, the logs did not show any error.

The error is still being displayed.

Thanks

Gautham

Former Member
0 Kudos

You can view the reason behind this error by following menu path :

Goto > Logs > On Release

Former Member
0 Kudos

Please double click on the error to see teh details

Former Member
0 Kudos

Hi

Please check whether the work scheduling view is extended for tha t material, if not so do it and then try again.

Regards.

Balu