on 06-05-2008 4:07 AM
Hi,
Originally I have an infoobject ZBASE which is a key figure. This infoobject along with every associated objects, i.e. cube, transfer rule, comm structure are transported into the production system.
Later I found out that ZBASE needs to be changed to a characteristic infoobject. How do i transport this new change into production system. And is there a sequence to how objects should be transported with this correction? Should i split up my transport?
Cheers
Hi,
You have to delete the ZBASE info object (Key Figure) from all the objects where ever you used(info cube, ODS, TR,UR etc). create a new info object ZBASE(CHAR) with its properties and add it to where ever you want to use it and then collect them from transport connection, and transport to QA and Prod systems.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Try deleting the data of its P-table of the object using SE14.. and then see if the object allows u to edit the same?
If it allows then proceed with the change and transport it to other landsacpe.. but u need to drop the data for this object in all the system...
As ur object is alread in production u will get the inconsistencies in the data...
As it gives inconsistencies in the data.. u can try deleting the same from all the objects.. but this also requires the dropping of data from all the targets.. and then try creating a new object and then proceed with the changes in the targets and move to next landscapes...
thanks
Hope this helps..
hi,
whether data load is started in production? if so have to delete the data first.
in dev-> delete the object from all the objects that uses it. then delete the object. capture everything in request.
then create the object with char type include it in all the objects wherever needed and capture everything in the same request.
do confirmation wether everything is done in the complete dataflow. hope update rules of the cube and subsequect target will get inactive, so activate those also and capture in the request.
do transport.
Ramesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can not change the property of an infoobject i.e. you can not change a KF to a characteristics. You need to create another characteristics for ZBASE and make changes to all the object whereever it is being used. Delete ZBASE KF from all your routines/cubes/dso and includ char ZBASE. Now transport it from dev to production. You need to transport all the object. Once the transport is successful, it will automatically overrite the production object.
No need to split your transformation. Capturte in a single request.
Thanks..
Shambhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
13 | |
13 | |
11 | |
11 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.