hi Gurus,
Please help me regarding material determination:
1. We want to maintain material A, B, C and D thru material determination.
2. Then if we put in material A, we want to have an automatic determination of which material is available (availabilty check).
3. We dont want it to be manually picked, but automatically determined.
How can we do that?