Hi,
I am using costing keys to access the different cost estimates in COPA. I have done the necessary configuration - created valuation strategy and assigned a point of valuation and assigned two costying keys - one for current and one for future costs. I have also mapped my value fields to each cost component. I mapped the one value field twice (representing each costing key) to each cost component.
My question is, when it comes to reporting, how do I show the values seperately that correspond to each costing key? Since I have the same value field being valued with current and future cost estimates, how are these shown separately in the COPA report? Or do I have to use two different value fields per cost component?
Much Appreciated