cancel
Showing results for 
Search instead for 
Did you mean: 

Serial Numbers

Former Member
0 Kudos

Hi Guru's

I know the standard Serial Number assignment is for a unique number per material/Batch.

My problem is that we often repair material that we have either manufactured or repaired in the past and SAP already holds a Serial Number/Batch combination. When we try to Create a Production Order and assign the serial Number of the product, we get a message stating the current batch doesn't match that of the previous batch, which it won't do as it a different Production Order.

Is there any way of allowing a serial Number to be reused with a different batch Number fro the same Material

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

Sys. is not allowing a serial Number to be reused with a different batch Number fro the same Material.

Actully we r working like same scenerio.

so u wil do one thing u can create "Z " reprort from that u can generated serial number. against every batch

My scenerio is we r genrated seial no. against every production order

if helpfull for u plz rewart back

Edited by: avinash pegarlawar on Jun 5, 2008 1:14 PM

Former Member
0 Kudos

Avinash

Thanks for the reply, but I am still uncertain as to what you have done to get around you situation, could you explain a your process in more detail.

Many Thanks

Paul Gray