Hi Community,
I need to perform a system copy from my productive redwood server to a test environment.
I plan to perform the copy by using a heterogenious system copy (export/import).
Do I have to consider anything before I start the new test system. Since the copy still knows all connections to the productive system, I'm afraid that all delayed batch jobs will be started on the production system.
Is there anything to do to avoid this or does this not happen by design?