Hi all,
I am working on Project System for our department. We will be using SAP PS and Scheduler from Rockwell automation for dynamic tracking of materials on the shop floor.
Our Project will have the following WBS:
1) Design
2) Process Planning
3) Material Planning
4) Manufacturing
5) Assembly
6) Trial
7) Approval
8) Dispatch.
Of the above 8 WBS, manufacturing activities will be scheduled and tracked through Scheduler instead of SAP PS.
How can the data from scheduler transferred to PS so that thw cost of each work center gets attached to the project?
Is it possible to transfer the data to PP module from scheduler instead of PS and still the cost gets attached to the project?
OR
Can PS be used for dynamic tracking and if yes please tell me how to go about it?
Thanks.