Hi Guys,
Greeting for the day u2026u2026u2026.
I am trying to create production orders creation for own order type ex MM01, but I am getting error message as u201C scheduling parameters are not defined for the order type u201C even though I have maintained following parameters as below,
Production scheduler -
xxxxx,
Detailed scheduling -
check box of scheduling ticked,
Rough cut scheduling --- scheduling id u201301, scheduling and generate capa requi,, boxes ticked,
Adjust scheduling -- requi to operation date,
Scheduling control for detailed scheduling ---backwards and check box of auto scheduling ticked
Operation segment ---setup,
All operation in order will be reduce
Do not reduce,
Could any one light on this issue,
Thanks in advance,
Mohan