Hi all,

In the sequence of the operation for the production of television in assy line totally take the production timing is 10 mins per piece in single assy line.with the 20 stations

so i want to produce the 1000 piece per the assy line. what will be the total prodection timing for the 1000 nos.

how we can use the overlapping

it not like 1000 nos * 10 mins in one assy line of 20 stations = 10000 mins to produce total nos

but for that manually calculate for 1000 nos = 2019 MINS

HOW THE SYSTEM CALCULATE THE TIMING IF WE GIVE THE IDIVIDUAL TIMING IN EACH OPERATION. AND HOW SYSTEM CALCULATE THE TOTAL TIMING FOR TH 1000 NOS.

WHAT IS MEAN BY OVER LAPPING