Skip to Content
author's profile photo Former Member
Former Member

Currency field in bapi_material_savedata

I am using BAPI_MATERIAL_SAVEDATA to update the planned price and date of an existing material.

I am passing excel file, it has currency field also,

Where i should pass the currency Waers field in bapi? please help

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Jan 30, 2018 at 09:44 PM

    Hi Dharika

    I think the error actually means the valuation area may be missing or plant

    • Check if you are passing a value here VALUATIONDATA = VALUATIONDATA and BAPI_MBEW-VAL_AREA. It reads from table T001K
    • Also check in PLANTDATA

    The currency is read based on plant and valuation area

    Read this link where you have the code snippet as well

    check these links for similar issue posted

    Regards

    Vinita

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.