Hi All
We are using Kanban with summarized JIT calls for external procurement. Control cycles are being uploaded using LSMW, this results in creation of Kanban cards in WAIT status. We wish to bring the card status to FULL directly against the standard sequence of WAIT
> EMPTY
>FULL which can be done only through T-Code PK31. We have more than 250 control cycles which on an average have 10 cards and doing this status change manually is quit time consuming. So we are looking for some automation for this process through PK31 or any other way to bring the status to FULL directly with quantity change.
We tried automating using LSMW & ECATT recording but it doesnu2019t work as in PK31 screen we need to move to the next Kanban card only through position because the card number is not an entry field.
We dont want to go by the standard sequence of WAIT
> EMPTY
>FULL because this would create unnecessary JIT calls & then changing the status to FULL will result in the GR of this JIT calls. The Status needs to be directly brought to FULL as the stocks are being uploaded through 561 & not by GR. This status change directly form WAIT -->FULL with quantity change is not allowed in PK21.
Do we have any other options to do this..
Any other suggestions would be appreciated.
Regards
Prasad