on 05-29-2008 4:00 PM
Hi Gurus
I have an issue , after executing ck11n my activity prices
for the product are reflected ,
values in kp26 are maintained for the period
cost centres assigned for the correct period to the work centres
my bom materials are reflected only
the following message is displayed with warning in yellow colour
Cost comp. split not transferred due to different cost comp. structure
Message no. CK347
Diagnosis
For this cost estimate, it has been specified that existing cost estimates are to be transferred.
The system found that cost component structure 01 of the transferred cost component split (see the Customizing settings for costing variant/plant PPC1/1000) is not the same as cost component structure 10 of the cost component split being transferred.
System Response
The cost component split is not transferred.
+*A total value is calculated for the cost estimate to be transferred. This value is assigned to a cost component in the cost component structure of the costing variant for the cost
estimate.*+
thanks in advance
ram
Hi,
There is some problem with your CO settings. In transaction OPL1, for the costing variant which you ar using, go to 'Assignments' tab page.
Here you will get the details of the cost component structure. Check the settings for your relevant company code and plant combination.
Take help from your CO consultant for this matter.
Also make sure your valuation class and price control indicator is correct in material master. And check your BOM and routing.
Hope this helps.
Shrenik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.