Hello Experts,
I have a problem about init load& delta load. In my customer's BW system, the data load had failed because of repeat delta update on 3rd February. So I decided the init. delta load with the selection of the start date 3rd February with the same infopackage by changing the load option. After this init load, is it ok if I change the load option to the delta load in the same infopackage and continue use with the same infopackage?
Points are waiting for you!
Regards
Muju