Scheduling in Planning table x (REM)

Hi,

When i assign quantities to the same production line, the "production start date" is always load for the earliest start date.

Example:

When I assign quantities of 2 differents materials in the same production line. The production start date beguin always at the 6h like if we can produce these materials at the same date.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 29, 2008 at 12:57 PM

    Hi,

    Check the SPRO setting OPU5 - Schedule Planned Order.

    Make necessary changes in Adjust Scheduling tab.

    You will get the desired result.

    Srini

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.