Skip to Content
author's profile photo Former Member
Former Member

Bapi ti change work center master data in APO

Hi All,

Can you please suggest any BAPI in APO to change master data for

Work Center.

Thanks

Mohit Khandelwal

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 29, 2008 at 08:38 AM

    Hi

    BAPI - BAPI_RSSRVAPS_SAVEMULTI_30A can be used to create or change the resource master data

    hope this helps

    regards

    Vijay

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 29, 2008 at 11:26 AM

    These are resource specific BAPIs (there is nothing specific for work center)

    BAPI_RSSRVAPS_BLOCK_SAVEMULTI Creation or Changing of Blocks

    BAPI_RSSRVAPS_CHANGEMULTI Change Version-Dependent Resources

    BAPI_RSSRVAPS_CREADEFS

    BAPI_RSSRVAPS_DELETEDEFS Deletion of Definitions

    BAPI_RSSRVAPS_DELMULTI Deletion of Version-Independent Resources

    BAPI_RSSRVAPS_GETBLOCKS

    BAPI_RSSRVAPS_GETBLOCKS2 Selection of Block Basis Definitions and Characteristic Value Assignme

    BAPI_RSSRVAPS_GETCAPAPRO Read Resource Capacities

    BAPI_RSSRVAPS_GETDEFS Read Definitions

    BAPI_RSSRVAPS_GETLIST Read Resources

    BAPI_RSSRVAPS_GETLOAD Read Resource Assignment by Orders/Operations/Activities

    BAPI_RSSRVAPS_REMOVESUBOBJECTS Deletion of Subobjects in Resource

    BAPI_RSSRVAPS_REMOVETEXT

    BAPI_RSSRVAPS_REQUESTBLOCKS

    BAPI_RSSRVAPS_REQUESTCAPAPRO Request: Selection of Capacities for Resource and Result Transfer

    BAPI_RSSRVAPS_REQUESTDEFS Request: Selection of Definitions

    BAPI_RSSRVAPS_REQUESTLIST Request: Selection of Resources and Result Transfer

    BAPI_RSSRVAPS_REQUESTLOAD Request: Read Resource Load through Orders/Operations/Activities

    BAPI_RSSRVAPS_SAVEDEFS Create or Change Definitions

    BAPI_RSSRVAPS_SAVEMULTI_30A Create or Change Version-Independent Resources

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 30, 2008 at 04:28 AM

    Hi Mohit - as indicated by Vijay and Srinivas, you can use the BAPI, BAPI_RSSRVAPS_CHANGEMULTI to change work centre relevant data in APO. One can change the following parameters:

    RESOURCE_HEAD

    RESOURCE_TEXT

    RESOURCE_QUANMODEL

    RESOURCE_SHIFTSEQ

    RESOURCE_DOWNTIME

    RESOURCE_RATEMODEL

    RESOURCE_DOWNTIME_TEXT

    RESOURCE_PP_BUCKET_CAPACITY

    Regards

    Vinod

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.