Hi,

Plz suggest me,

we are having conductor div.n we req Drum to wind a wire coductor these drums having size of std lagging for dispatch but length is varied in coductor for winding.when i wan to fixed the quntity of lagging for perticular drum i used key fixed quntiy but at time conversion from pln order to prod order, system takes only fixed quantity for 10 drums also e.g.1 drum =65 lags & for 10 drum=65 lags after fixed key used.

But my reqmt is that when i will make prod order at that time the system varies the lagging nos. with propertion to lenth of conductor & that shuld not happen lagging nos. shoul be fixed.So plz tell me the procedure for this thing

thank u

Regards-

jagdish

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi jagdish

Fixed quantity in BOM means. Always it will create proposal for that particulare quantity only irrespective of the order quantity

For ex if you say for MAT A in BOM the quantity is 1 No and if you tick fixed quantity indicator. The system will always create proposal for 1 No irrespective of the BOM header quantity.

This will be useful to create fixed quantity for a order for inspection or other purpose.

If you want MRP to be exploded as per the BOM header quantity. Use alternate unit of purchase.

Hope this is clear

Regards

J . Saravan

Former Member
0 Kudos

Dear Sir,

My reqmt is when we gave 10nos. of quantity of wooden lags for drum packing with prod order of 20 km wire but when wire production will reduced that quantity of lags also reduced so i hv to fixed that quantity for less km of wire also thanks do needful.

jagdish

Answers (2)

Answers (2)

sundaresan_velayudam
Active Contributor
0 Kudos

In the bom , In the item detail of the component ,Select fixed quantity( in the Basic data tab) it will solve your problem.

Former Member
0 Kudos

Sir,

i had done that thing but when u convert order from pln to prod the system takes only fixed quantity if no.of drum also increased e.g.1drum = 65 lags & for 10 drums = 65 lags that should be 650 lags plz do needful thankx

jagdish

Former Member
0 Kudos

Create 1 more UOM for conductor to length dimension. Change the base qty for conductor in BOM. Dont put fix qty. Define the relation in BOM. In MRP run system will behave as u r expecting

Former Member
0 Kudos

but if i wan to run it for diff length of wire that quantity should be fixed & u mean that change base quantity in customizing or anywhere else.thank u