fixed quantity in BOM item

Hi,

Plz suggest me,

we are having conductor div.n we req Drum to wind a wire coductor these drums having size of std lagging for dispatch but length is varied in coductor for winding.when i wan to fixed the quntity of lagging for perticular drum i used key fixed quntiy but at time conversion from pln order to prod order, system takes only fixed quantity for 10 drums also e.g.1 drum =65 lags & for 10 drum=65 lags after fixed key used.

But my reqmt is that when i will make prod order at that time the system varies the lagging nos. with propertion to lenth of conductor & that shuld not happen lagging nos. shoul be fixed.So plz tell me the procedure for this thing

thank u

Regards-

jagdish

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 30, 2008 at 05:21 AM

    Hi jagdish

    Fixed quantity in BOM means. Always it will create proposal for that particulare quantity only irrespective of the order quantity

    For ex if you say for MAT A in BOM the quantity is 1 No and if you tick fixed quantity indicator. The system will always create proposal for 1 No irrespective of the BOM header quantity.

    This will be useful to create fixed quantity for a order for inspection or other purpose.

    If you want MRP to be exploded as per the BOM header quantity. Use alternate unit of purchase.

    Hope this is clear

    Regards

    J . Saravan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Dear Sir,

      My reqmt is when we gave 10nos. of quantity of wooden lags for drum packing with prod order of 20 km wire but when wire production will reduced that quantity of lags also reduced so i hv to fixed that quantity for less km of wire also thanks do needful.

      jagdish

  • author's profile photo Former Member
    Former Member
    Posted on May 29, 2008 at 07:40 AM

    Create 1 more UOM for conductor to length dimension. Change the base qty for conductor in BOM. Dont put fix qty. Define the relation in BOM. In MRP run system will behave as u r expecting

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 29, 2008 at 09:33 AM

    In the bom , In the item detail of the component ,Select fixed quantity( in the Basic data tab) it will solve your problem.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Sir,

      i had done that thing but when u convert order from pln to prod the system takes only fixed quantity if no.of drum also increased e.g.1drum = 65 lags & for 10 drums = 65 lags that should be 650 lags plz do needful thankx

      jagdish

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.