cancel
Showing results for 
Search instead for 
Did you mean: 

Consideration of valuation type in MRP

Former Member
0 Kudos

Hi

I have a metrial with split valuation with valuation type IMP & DOM. So in MRP run I want the system to select either IMP or DOM. How can I do that? You may be knowing that in normal MRP run, system does not consider any valuation type & take a default MAP from material master.

Any advice

Thanks & regds

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Pls mention if anyone has a solution/suggestion??

Thanks & regds

Former Member
0 Kudos

closed

Former Member
0 Kudos

Hi,

There is no such normal MRP run.

Whenever we take MRP run, system will consider only the main material and not the split valuation type.

THe main concept of using split valuation is only for that itself. It is there for planning irrespective of valuation type.

But if you want the system to behaive in such fashion that it should plan one part and not he other then use different material code instead of split valuation. Define these two material codes as alternative and give the usage probability as 0% and 100%. MRP will consider only that material which is having 100% usage probability.

Regards

Amit Parkhi