cancel
Showing results for 
Search instead for 
Did you mean: 

table name for work centers with production or planned orders

bear_boy
Participant
0 Kudos

dear gurus,

can you please help me on what table names have the work centers with planned or production order

Accepted Solutions (0)

Answers (2)

Answers (2)

muthusamy_sankaran
Active Contributor
0 Kudos

Hi,

For production orders

Table S022 (Fileds AUFNR, ARBPL)

For Planned orders

once you converted planned order to production order then it will take from routing, until never copied routing operation data

hope it will help for you, if you need more details plscome back

Regards,

Sankaran

Former Member
0 Kudos

For production Order

1.AUFNR ---> AFKO ---> AFKO-PLAF

2.AFKO-PLAF --> AFVC -


> for respective VORNR get AFVC-ARBID

3.AFVC-ARBID --> pass as OBJID into ---> CRHD --->ARBPL (Work Center)

For planned orders

1.PLNUM ---> PLAF ---> PLAF-BEDID

2.PLAF-BEDID -


> KBKO ---> PLAF-PLNNR, PLAF-PLNAL

3.PLAF-PLNNR, PLAF-PLNAL -


> PLPO -


> for corresponding VORNR (Operation number) get ARBID pass as OBJID ---> CRHD --> ARBPL (Work Center).

Regards

soundar

Edited by: Soundar on May 29, 2008 9:18 AM