Hello,
We are planning a refresh / system copy of an ECC 6.0 and SRM-SUS 5.0 system
The refreshes will be completed from backups taken of production systems refreshed onto the QA Landscape.
I have referenced the following SDN thread that provides some guidelines on how to refresh R/3 and SRM systems and maintain data consistency between the systems using BDLS and changing entries that correspond to backend RFC destinations:
[Is there a process/program to update tables/data after System Refresh?;
This thread is fairly old and relates to earlier versions of R/3 (4.7) and SRM (3.0). We have heard that at higher system versions there may be technical reasons why a refresh canu2019t be performed.
Does anyone have experience of completing successful refreshes of landscape that contain ECC and SRM systems at higher SAP versions (ideally ECC 6.0 and SRM-SUS 5.0) Does anyone know whether it is technically possible?
Are there any additional steps that we need to be aware of at these higher SAP versions in completing the copy to ensure that the data remains consistent between ECC and SRM?
Thanks
Frances