Skip to Content
0
Former Member
May 28, 2008 at 10:05 AM

Material availbility thru MRP Run in non-project stock

23 Views

If i do a MRP run for a project and make a reservation for a material but available in some other storage location (not for project stock), does it block the material physically in that storage location for my requirement?