Skip to Content
0
Former Member
May 28, 2008 at 09:54 AM

Document link from Production order to Routing.

91 Views

Hi, All

I have linked some documents in [CO02] production order to operations through PRT.

as my knowledg it has to be trigger in routing[CA03] when i click PRT header data.

But this is not happening. I m working in development server.

I tried both way from Routing to Production Order Also. But document link is not establising in both cases.

Also [CS02], bom item/header, linked documents are not triggering in production order[CO02]

Rgds

Ben